JCMB Technology Inc.

  • Increase font size
  • Default font size
  • Decrease font size
Home About Us Success Stories
PDF

Hydro Quebec logo

Hydro-Québec Distribution – DCartes Project

The scope of this project was to reconcile multiple source data provided by Hydro-Quebec, convert the data into a single, centralized data repository within a JCMB conversion environment, perform Quality Assurance on the data, and finally transfer the certified data to GE Smallworld, currently being implemented at Hydro-Quebec Distribution.

Read more...
 
PDF

Sierra Pacific logo
Operation FUSION   
Sierra Pacific Power Company

Technology that Improves Distribution Operations

More and more utilities are investing in major applications (Mobile Computing, Outage Management and Automated Mapping & Facilities Management) in order to improve operational efficiencies.  

Read more...
 
PDF
Boulder logo

City of Boulder City, Nevada - Home of the Hoover Dam

Embracing Technology
by: Ned J. Shamo, Electruc Utility Administrator


For a number of years I had been concerned that the electrical system maps that we had in Boulder City, left much to be desired. 

We had a mapping system that had been started when the town was first built in the 1930s; the United States Government built the town to serve as the construction camp for Hoover Dam,
Read more...
 
PDF
NU logo

Mapping Northeast Utilities’ Underground Network

It’s difficult to appreciate the danger and frustration that underground workers face in their daily tasks. Imagine going to work in the middle of the street where you need cones and a barrier for protection, and maybe even a policeman: where you need to test the manhole cover for stray voltage and the air for dangerous gases.

Read more...
 

Events

Meet us at Distributech 2020

Don't hesitate to contact us to make an appointment to meet with us during the show.