JCMB Technology Inc.

  • Increase font size
  • Default font size
  • Decrease font size
Home About Us Success Stories Hydro Québec - DCartes project
PDF

Hydro Quebec logo

Hydro-Québec Distribution – DCartes Project

The scope of this project was to reconcile multiple source data provided by Hydro-Quebec, convert the data into a single, centralized data repository within a JCMB conversion environment, perform Quality Assurance on the data, and finally transfer the certified data to GE Smallworld, currently being implemented at Hydro-Quebec Distribution.

JCMB was selected through a competitive Request for Proposal process.  Hydro-Quebec was seeking a firm that would provide them with expertise in data conversion services. The selection criteria used by Hydro-Quebec required demonstrated skills and knowledge within the following specific areas:

  • Data Source Consolidation
  • Data Conversion
  • GIS Data Load (Geographic Information System)
  • Quality Assurance

“When presented with a GIS implementation project as significant as this one, JCMB Technology was able to effectively demonstrate their data conversion knowledge and know-how, and stand out among world-class suppliers”, stated André Potvin, Dcartes Project Manager, Hydro-Quebec Distribution.

JCMB customized their technology in order to meet the specific needs of Hydro-Quebec with regards to data capturing and validation. The automated technologies provided by JCMB assured a high level of quality for both the accuracy and consolidation of the data.

To read the entire story select,  
Hydro-Québec Distribution - DCartes Project

 

Events

Meet us at Distributech 2020

Don't hesitate to contact us to make an appointment to meet with us during the show.